This procedure details the steps for creating a new status.

WARNING: Please remember that for a status to be available for a process, it needs to be later related in the Process-Status-Result (PSR) configuration, otherwise, by configuring statuses here we just create the status, but it cannot be used until it is related with a specific process. For the procedure, please see: relations PSR

Step 1: Status Configuration

    1. Click on the button from the Main Window of the Terminal.
    2. Select Statuses in the CLICK TO CONFIGURE dropdown.

Step 2: Fill the fields

    1. Fill the fields to configure the new status:
      • Description: write a name for the status, for example: Dependency1.
      • Code: write an abbreviation or code for the status, for example: D01.
      • Type: select whether the status is a stop, a dependency, a title, etc.
        • Stop and Idle do not affect the OEE.
        • No scheduled and Dependency affect the OEE.
        • Title is a status type used as a status agrupator. For example: to put all the type of stops toghether.
      • Level: indicate the level of the status in a tree structure. For example: if we configure DEPENDENCY as a "Title" and Level 1, the status that we want to be in this category will have the level 2.
      • Etc.
    1. Press to insert the new status .Repeat this action for each new status to add.
    2. When all the changes have been done, press the button.