Production targets
You can access to this window by clicking any of this records:
Only text fields that are inside boxes can be edited. Therefore OEE, PE and OPCE can not be edited and are automatically calculated upon the rest of the ratios.
CONFIGURATION PARAMETERS:
- OEE and PE: calculated upon the rest of the fields. Not editable.
- Define OEE:
- A: availabilty.
- S: speed.
- Q: quality.
- Defines productive efficiency:
- PA: Productive availability is the same as availability but without considering idle statuses.
- OCE: overall consumption effectiveness.
- OPCE: calculated upon the rest of the fields. Not editable. OPCE = OEE * OCE.
- MTBF Targets:
- Qt.: target quantity of failures.
- MTBF: number of minuts of duration of failures.
- MTTR: number of minuts of duration of the failure until repaired.
Qt.<: yellow and green target for the maximum number of stops of the process, according the MTBF table.