Theoretical consumption
You can access to this window by clicking the button.
Theoretical consumption can be assigned to a number of elements, like processes, status, etc.
CONFIGURATION PARAMETERS:
- Cons: type of consumption.
- Time: select the unit (for example hour) and type the number of seconds that the unit of time implies. All consumption will be shown regarding this unit of time.
- Min. Cons. / Max. Cons.: minimum and maximum consumption expected.
- Cost.: cost per unit of consumption.
- CO2e: CO2 gas equivalent per unit of consumption.
- Start: date and time on which this theoretical consumption starts applying.
- Daily: is this theoretical consumption applies every day at the same time. This is useful to define daily time frames. For example: to define 2 daily time frames, from 8 to 16 h. and from 16 h. to 8 h., you need to configure 2 theoretical consumptions and mark them "daily".